The motorcycle production line is consist of three main parts: assembly line, testing line and package line .
1. Process for assembly
1.1 For motorcycle assembly
No. | Item |
01 | Frame Marking |
02 | Press axle |
03 | Connect cable, fix cushion and lacing wire |
04 | Install rear wheel fork combination ,rear brake connection |
05 | Install filter |
06 | Ignition coil |
07 | Install front of rear fender , voltage regulator line, starting relay, flasher |
08 | Front fork suspension and front sign bracket combination ,Head lock combination ,connection board combination on instrument , flexible axle |
09 | Install front fender, front fender lining, front license plate bracket |
10 | Install rear of rear fender ,rear license plate bracket, rear taillight, rear label, rear reflector |
11 | Install rear of rear fender, rear turn light bracket ,rear turn light |
12 | Install main bracket ,rear brake arm combination |
13 | Install front wheel , rear wheel split pin |
14 | Install light ,fairing, windshield |
15 | Install Hand assembly |
16 | Install left & right front fork, front turn light, side reflector |
17 | Install carburetor, wiring |
1.2For engine assembly
No | Item |
01 | Engine Assembly |
02 | Engine assembly frame ,rear break pull rod |
03 | Tighten carburetor |
04 | Install front wheel combination |
05 | Install rear wheel rear fork combination |
06 | Adjust chain, tighten rear wheel |
07 | Adjust rear brake |
08 | Tighten rear shock, instrument combination and front fork |
09 | Tighten left & right of rear paddle combination |
10 | Tighten silencer |
11 | Wiring |
12 | Install chain case |
12 | Install handlebar |
13 | Install starting arm |
14 | Install throttle cable |
15 | Install front light combination |
16 | Engine right & left cover, gear shift pedal |
17 | Tighten top of rear shock absorption |
18 | Tighten fuel tank |
19 | Tighten accumulator box |
20 | Frame rubber gasket, left & right body cover |
21 | Tighten rear central cover |
22 | Tighten left & right side cover |
23 | Tighten rear storage rack |
24 | Install cushion and fuel tank lock |
2. Production line list
No. | Name | Quantity | Note | |||
1 | (1) | Assembly line | Line | 1 set | 1 pcs | 45m |
(2) | Drive and control | 1 pcs | ||||
(3) | Jig | 36 pcs | ||||
(4) | Turn-line hoist(250KGS) | 1 pcs | ||||
(5) | Pre assembly work table | 1 pcs | ||||
2 |
Testing line | 1 set | ||||
3 |
Package line | 1 set | 15m | |||
4 | (1) | Public facility | Air compressor | 1 set | 1 pcs | |
(2) | Air tank | 1 pcs | ||||
(3) | Filter | 1 pcs | ||||
(4) | Marking machine | 1 pcs | ||||
(5) | Tyre machine | 1 pcs | ||||
5 | (1) | Pneumatic tools | Gas driving spanner | 1 set | WT985 | |
(2) | Pneumatic screwdrive | WT203 | ||||
(3) | Spring balancer | |||||
(4) | Air charging gun | |||||
(5) | Sprial air pipe | 8×12×7.5M | ||||
(6) | Pneumatic screwdrive(Gun type) | WT208 | ||||
(7) | Gas driving spanner | WT906 | ||||
(8) | Torque spanner | |||||
(9) | Digital multimeter | |||||
(10) | Vernier caliper | |||||
(11) | Electric hand drill | 13RE | ||||
(12) | T-Sleeve | 8-19 | ||||
(13) | Tool bit | QT-L | ||||
(14) | Sleeve | 1/2 | ||||
(15) | Internal hexagonal wrench |